Café Royal Luxury Hotel
Contract terms:
Installation of our Operations Office in London
Application of UK Regulations (National British Standards)
Development of Typical Details for approval
Development of Project Drawings into drawings for the production of SOW handcrafted furnishings, and drawings for on-site application
Production schedules, Part nomenclatures and coding
Coordination of Sample Prototyping
Management of the client's approval flow
Management of Design Change processes
Coordination of Topographic Surveyors and Overlay Checking
Management of technical relationships between local architects, the main client in the name and on behalf of our client (leading Italian contract company)
Development of Value Engineering for the refurbishment of the handcrafted furnishings
in decorative gypsum, bronze casting, Murano glass and for part of the modern handcrafted furnishings in wood and marble
Sourcing, selecting, proposing and managing potential suppliers
Coordinating installations
Project economic management

Key Factors:
Location: London, United Kingdom
Date of appointment: October 2011
Duration of assignment: 18 months
SOW: Complete renovation of historical and ornamental areas, creation of common areas and SPA








Café Royal Fit Out Engineering
Café Royal Value Engineering
London Luxury Apartments
Contract terms:
​
Installation of our Technical Team at our customer's premises
Assistance during technical meetings in London
Application of UK Standards (National British Standards)
Development of Typical Details for approval
Development of Project Drawings into Drawings for the production of SOW handcrafted furnishings, and drawings for on-site application
Production schedules, Part nomenclatures and coding
Coordination of Sample Prototyping
Management of the client's approval flow
Management of Design Change processes
Topographic Survey, Graphic rendering, Setting Out on-site
Development of wood, gypsum and marble cladding, creation of over 1200 customised doors, development of 10k square metres of flooring, modern and artistic staircases and rails, over 200 marble bathrooms with accessories and furniture, wooden panelling and gypsum/wood ornaments, custom-made fireplaces, substructures
Co-ordination of architectural discrepancies
Issuing of Production schedules with Part nomenclatures and coding

Key Factor:
Location: London, United Kingdom
Date of appointment: April 2017
Task duration: Work in progress
SOW: Fit Out of over 10K square metres for 72 Luxury Apartments + Common Areas: five Lobbies, one Cinema, one SPA, one Gym, one Library
Luxury Apartments Fit Out Engineering




City Circle Line
Contract terms:
​
File rendering for tracking
On-site tracking support
Wall & floor marble cladding engineering
Issuing of Fabrication Drawings
Issuing of metal component schedules for substructure handcrafted furnishings and stainless steel parts included in the order
​
964 ltd activated three individual Technical Teams (two located on site on behalf of the two Italian contractors), which provided on-site services and back office development to support the executive design of the marble cladding and part of the design's metal components, as well as contributing to part of said executive design.

Key Factors:
Location: Copenhagen, Denmark
Date of appointment: October 2017
Duration of assignment: 17 months
SOW: Georeferenced Topographic Survey for 17 stations, Fit Out of Cladding Engineering for seven stations




Circle Line Survey Topografico / Engineering
Skin Claddings Facades
Key Factors:
Period: 2015 - 2018
We assist the companies producing façade components by processing individual procedures in the technical language used by each of our clients. We work primarily with expert teams dedicated to the development of each individual element in the BIM environment. We have proven experience in the use of multiple materials and their performance.
We can conduct in-depth parametric studies of the Sample mockups and Typical Details, which we then apply to the development of each individual project. We are able to write analysis codes aimed at optimising through theoretical simulations the entire progress of a project, and we coordinate with our clients for the collection and management of architectural inputs. We then render all the components’ analytical documents in the form of Manufacturing Drawings and quantitative and statistical analysis tables. Finally, we codify parts and help producers adapt our files to their CAD-CAM production systems


...COMING SOON...
Structures Engineering
Key Factors:
​
Period: 2011 - 2018
​
We are equipped to develop projects of metal carpentry structures by implementing BIM. We can help companies by developing each procedure in the technical language used by each individual client, we coordinate with our clients for the collection and management of architectural input, and we interpret all the component analytical documents by means of Fabrication Drawings and statistical analysis tables. We then codify the parts and help producers adapt our files to their CAD-CAM production systems.
Megève Chalet
Key Factors:
Location: Megève, Savoy, France
Date of appointment: January 2010
Duration of assignment: 10 months
SOW: Turn Key contract for a 240-square metre villa on behalf of a major Italian contract company.​
​
Contract terms:
Working drawings and specifications of part of the villa
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
On-site coordination of workers and fitters
Delivery of work on behalf of the Contractor
Bratislava Villa
Key Factors:
Location: Bratislava, Slovakia
Date of appointment: October 2006
Duration of assignment: 9 months
SOW: Turn Key Contract for a 900-square metre villa on behalf of a major Italian contract company.
​
Contract terms:
Working drawings and specifications of part of the villa
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
On-site coordination of workers and fitters
Delivery of work on behalf of the Contractor
3D modelling
Gallery
Milan Stainless Steel Staircase
Key Factors:
Location: Milan, Italy
Date of appointment: March 2007
Task duration: 4 Months
SOW: Turn Key Contract for a self-supporting steel staircase with veranda on behalf of a major Italian contract company.​
Contract terms:
Value Engineering
Working drawings and specifications of self-supporting staircase and veranda located in a penthouse flat plus terrace
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
On-site coordination of workers and fitters
Delivery of work on behalf of the Contractor
Moskow Luxury Penthouse
Key Factors:
Location: Moscow, Russia
Date of appointment: February 2008
Duration of assignment: 7 months
SOW: Turn Key Contract for a 225-square metre villa on behalf of a major Italian contract company.​
Contract terms:
Value Engineering
Working drawings and specifications of each furnishing element, such as furniture, panelling, stairs, seats and upholstered items
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Coordination of workers for installation
Production in kit complete with manuals for remote installation on behalf of the Contractor
Shanghai Versace Loft
Key Factors:
Location: Shanghai, China
Date of appointment: July 2010
Duration of assignment: 5 months
SOW: Turn Key Contract for a 176-square metre villa on behalf of a major Italian contract company.​
​
Contract terms:
Value Engineering
Working drawings and specifications of each element of furnishings from the parent company's collection
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Coordination of workers for installation
Production in kit complete with manuals for remote installation on behalf of the Italian Contractor
Gran Canaria Radisson Blue
Key Factors:
Location: Arguineguin, Gran Canaria
Date of appointment: May 2010
Duration: 3 Months
SOW: Concept Design, Fabrication drawings, Mockup management, Installation manuals for 140 serviced flats
​Contract terms:
Concept Design
Value Engineering
Working drawings and specifications of each element of furnishing
Production cycle coordination
Quality control
Production time control
Packaging and Shipping co-ordination
Technical assistance with installation methods on behalf of the Contractor
Moskow Luxury Kitchen
Key Factors:
Location: Moscow, Russia
Date of appointment: July 2006
Duration of assignment: 5 months
SOW: Turn Key contract for a 98-square metre kitchen ​on behalf of a major Italian contract company.
Contract terms:
Value Engineering
Kitchen working drawings and specifications
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Coordination of workers for installation
Production in kit complete with manuals for remote installation on behalf of the Contractor
Prague Luxury Apartment
Key Factors:
Location: Prague, Czech Republic
Date of appointment: September 2009
Duration of assignment: 9 months
SOW: Turn Key Contract for a 198-square metre flat​ on behalf of a major Italian contract company.
​
Contract terms:
Value Engineering
Working drawings and specifications of each element of furnishings
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Coordination of workers for installation
Delivery of work on behalf of the Contractor
Concept Design
Gallery
Staircases
Key Factors:
Period: 2006 - 2016
In each project, staircases more than any other element express the design style of the place that hosts them.
We use our expertise to develop and implement sophisticated design procedures that synthesise traditional crafts and techniques handed down by skilled artisans.
Our long collaboration with staircase manufacturers has enabled us to learn and eventually excel, especially in cases when the resulting product exceeds the use limitations imposed by extreme materials. Today, even in this niche subject, 964 ltd can apply its expertise to the immediate advantage of customers.
Rome Rooftop Terrace
Key Factors:
Location: Rome, Italy
Date of appointment: March 2015
Duration of assignment: 3 Months
SOW: Turn Key contract for a 110-square metre living space on a terrace on behalf of a major Italian contract company.
Contract terms:
Concept Style
Executive Design of part of the property
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Remote coordination of workers and fitters
Delivery of installation manuals on behalf of the Contractor.
Paris Penthouse
Key Factors:
Location: Paris, France
Date of appointment: January 2014
Duration of assignment: 5 months
SOW: Turn Key contract for a 130-square metre flat on behalf of a major Italian contract company.
​
Contract terms:
Concept Style
Working drawings and specifications of part of the property
Choice and management of artisan suppliers
Production cycle coordination
Quality control
Production time control
Packaging and Shipping coordination
Remote coordination of workers and fitters
Delivery of installation manuals on behalf of the Contractor